Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Fri Aug 30 20:39:50 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6128675
Posted: Jul 18 (10:55)

4 Responses
Last Response: Jul 18 (12:59)
General Travel
9196 views
2

Jul 18 (10:55)  
Rail_0326~
Rail_0326~   518 blog posts
Entry# 6128675              
What is the difference between Primary Maintenance and Secondary Maintenance?
Translate to English
Translate to Hindi

7123 views
2

Jul 18 (11:05)
HarshaI22159^~
HarshaI22159^~   10971 blog posts
Re# 6128675-1               Past Edits
2 compliments
Agree Useful
Primary Maintenance happens at the base Station where the train is homed, Secondary Maintenance happens after a train travels a certain distance which upon crossing that threshold, the Train would require Secondary Maintenance, For Primary Maintenance, a Rake requires 8 hrs of lieover time at the station of which 6 is for the actual maintenance and around 2hrs is for shunting purposes, im unsure of SM Period

in Primary Maintenance, everything about a rake is checked and errors are rectified if any. In Secondary Maintenance this is also same. There is also
...
more...
another type of maintenance called "OEM or Other End Maintenance" which is done for trains which would return from its destination the same day usually on the Platform itself, it contains watering of train and rake cleaning.

Translate to English
Translate to Hindi

6654 views
1

Jul 18 (11:11)
kjmwag9hc~
kjmwag9hc~   2317 blog posts
Re# 6128675-2              
1 compliments
Useful
SM is 2hours I think
Translate to English
Translate to Hindi

6516 views
2

Jul 18 (11:30)
Arpan~
Arpan~   5698 blog posts
Re# 6128675-3              
2 compliments
Useful Useful
not sure but Secondary Maintenance also takes 6 hours.
Translate to English
Translate to Hindi

4626 views
6

Jul 18 (12:59)
thedemigod
thedemigod   272 blog posts
Re# 6128675-5              
2 compliments
Useful Useful
Primary maintenance is done at the base CDO, i.e., the station to which the rake belongs. It may or may not be one of the originating stations. It is the complete inspection and maintenance for the rake's next run. The coaches and it's equipments are checked for any defects, and underslung equipment is checked and repaired if needed.

Primary maintenance also consists of inspection of the brakes, hydraulics, AC components, and oil changes if needed. Wheel alignments are also checked. Scheduled biotoilet tank cleanup, pest management is done during PM. The coaches
...
more...
are also washed and cleaned from inside and outside. 6 hours are allotted for primary maintenance.

Secondary maintenance depends on the train. While premium trains such as Rajdhani, Duronto and Shatabdi undergo SM after every run, regular trains require SM after 4000 km round-trip if LHB and 3500 km if ICF.

It consists of checking the trains running equipment, brakes and interior components, water filling, cleaning the coach as per requirements. It's not as thorough as PM, but checks the train's fitness for the next run to it's home station.

Some trains get platform return, due to time constraints or unavailable maintenance facilities, so they're cleaned and water filling is done on the platform itself before the next run.

RBPC or Round Trip Brake Power Certificate is issued by the base CDO to trains not undergoing SM at the other end of journey. Again premium trains are exceptions and are given BPC at both end of journey.

Short distance regular trains require maintenance or BPC when they complete 4000km- LHB/3500km- ICF, even if they touch the base station multiple times during this distance.

Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

1860484 ★★★ 115BangaloreMail^~
5187671 ★★★ 151Jordan~
6099034 ★★ 24jishnuthakur12301^...

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy