લોકોને મોટી રાહત થશે:કડીની વડવાળા રેલવે ફાટક લોખંડના થાંભલા હટાવી 10 મીટર પહોળી કરાઈDue to the ongoing broad gauge conversion of the Katolsan-Kadi-Kalol railway line, the railway crossing near Vadvala Hanumanji Temple in Kadi was causing traffic congestion. The crossing, with its narrow opening, was causing inconvenience for heavy vehicles and pedestrians. After local residents, led by Indian Railway Finance Corporation director Vallabhbhai Patel,...
more... appealed to the railway department, the crossing was widened from 7 meters to 10 meters by removing iron pillars. The railway tracks were also made more accessible by adding gravel and sand. This measure aimed to alleviate the traffic issues experienced by students, pedestrians, and residents using the busy thoroughfare connecting Thol, Kalyanpura, Viramgam, and Sachana.
Kadi me Vadvala Hanumanji Mandir ke paas railway crossing par traffic jam ki problem thi, kyuki Katolsan-Kadi-Kalol railway line ko broad gauge me convert kiya ja raha hai aur crossing bahut narrow thi. Is wajah se heavy vehicles aur pedestrians ko problem ho rahi thi. Local residents aur Indian Railway Finance...
more... Corporation ke director Vallabhbhai Patel ne railway department se request ki, jiske baad crossing ko 7 meters se badhakar 10 meters kar diya gaya aur iron pillars hataye gaye. Railway tracks par gravel aur sand bhi dala gaya, jisse crossing ko use karna aasan ho gaya. Isse Thol, Kalyanpura, Viramgam, aur Sachana jaane wale students, pedestrians aur residents ke liye traffic problem kam ho gayi.