Looking at the speed I think JBP-ET section can be energized by March next year. However, JBP-COI section might take a bit longer time. Hopefully by end of 2017 the entire section will see the E-loco's hauling trains and it will enhance the punctuality as the E-locos have relatively faster acceleration than D-locos.