Finally!! Got up early and planned a short trip to Rewari to providing you latest updates on RE-MHU-HSR #Electrification & #Doubling.
Board train : 54835 (HSR-RE PXGR)
Return Board train :59721 (JP-HSR FAST PXGR)
Highlights : ( Statics are in % & acc to my data )
◆◆Doubling...
more... ●RE-KSI work almost done 99% including track laying,linking and signalling. 1% remainedmained for track linking.
●KSI-MHU work for track laying & linking is done almost 60%.Levelling work done 80%.Remaining work left 20%.
◆◆◆Overall work done 65-70%
◆◆Electrification
●Railway is setting up TSS at STD & RE
●RE-KSI work for pole basic structure is complete on both side (up-dwn) . Pole erected 70%.
●KSI-MHU work for pole basic structure is in progress
●MHU-HSR work for pole basic structure completed till Hansi (HNS) (50KM).
Pole have been erected from MHU to in between BWK-JKZ (35KM).
Wiring & OHE Eqip have been completed till BWN (14KM)
●●Work for Plateforms including increase in height and 2nd platefrom are in progress till BWK.
KSI will now have 3 Plateforms currently only have single.
●● Today i saw heavy load on RE-HSR track met with 10 WDG with 10 different Goods and Coal train
◆◆◆ IMP NEWS: RAILWAY is CONSTRUCTES A BY-PASS LINE TO IGNORE REWARI UNDER WDFC WHICH CONNECT RE-HSR SECTION TO RE-FL SECTION UNDER WDFC. A GREAT RELIEF !! (this is not confirmed news ...but i am informing you as i saw rly constructing bridge and other work just 10km before rewari on HSR-RE section)
Today's Blog Upload
●Doubling
●Electrification
●HSR-RE Pxgr - 54835
●JP-HSR Fast Pxgr - 59721
●DEE-BDTS GR - 12215
●BDTS-DEE GR - 12216
●SLN-ADI Exp - 19404
●VARIOUS WDG LOCO PICS
●Various Station pics
#Hisar