Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Wed Sep 18 12:10:53 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6168209
Posted: Aug 25 (18:25)

No Responses Yet
Rail News
4376 views
0

IR Affairs
NER/North Eastern
Aug 25 (18:25)   Prayagraj Rambag Station Reopens for Passenger Trains After 60-Day Closure

AdittyaaSharma^~   73628 news posts
Entry# 6168209   News Entry# 566541         Tags   Past Edits
Prayagraj : रामबाग स्टेशन पर 60 दिन बाद शुरू हुआ ट्रेनों का ठहराव, चार नंबर लूप लाइन मेन में तब्दील

After a 60-day closure, passenger trains have resumed halting at Prayagraj Rambag station. The railway had taken a block to improve infrastructure in preparation for the Kumbh Mela. The first train to halt at the station after the work was completed was the Lichchhavi Express on Saturday evening. Railway officials have...
more...
stated that trains whose halting was canceled, including the Chauri Chaura Express, have now resumed halting at Rambag. The Railway Vikas Nigam Limited had requested a 75-day block for doubling the line from Prayagraj Rambag to Prayagraj Junction, which involved converting loop line number four at Rambag station into the main line and constructing a new platform. This request was later approved for 45 days and further extended for 15 days. The work has now been completed. The next step involves installing electronic interlocking at the junction. Once this is done, trains can run at a maximum speed of 120 km/h on the converted loop line number four at Rambag station. The General Manager of RVNL, VK Agarwal, stated that 2,000 tractor loads of earth were excavated for the new line. After laying the material for the main line, a new platform with three sheds was built. A foot overbridge was extended, and work is currently underway to construct ramps for the differently abled on another foot overbridge.

Prayagraj Rambag station pe 60 din ke baad passenger trains ka thahraav shuru ho gaya hai. Kumbh Mela ke liye railway ne infrastructure sudharne ke liye block liya tha. Kaam pura hone ke baad, shanivaar shaam ko pehli train, Lichchhavi Express, Rambag pe rukhi. Railway officials ne bataya ki Chauri Chaura...
more...
Express jaise trains jinka thahraav band kiya gaya tha, woh ab Rambag pe shuru ho gaya hai. Prayagraj Rambag se Prayagraj Junction tak dohrikarane ke liye, Rambag station ki loop line number four ko main line mein badalane aur ek new platform banane ke liye, Railway Vikas Nigam Limited ne 75 din ka block manga tha. Baad mein use 45 din ki manzuri mili. Isse 15 din ke liye aur badha diya gaya. Phir, yaha ab kaam pura ho gaya hai. Ab junction pe electronic interlocking ka kaam hona hai. Ye pura hote hi, Rambag station ki four number loop line, jo main line mein badal gayi hai, usse 120 ki maximum speed se train chalaai ja sakegi. RVNL ke General Manager VK Agarwal ne bataya ki yaha naya line bichane ke liye 2,000 tractor mitti nikali gayi. Baad mein main line ka material dala gaya. Yaha ek platform ka bhi nirman kiya gaya. Usme teen sheds lagae gaye hain. Ek foot overbridge ka bhi vistaar kiya gaya. Saath hi ek aur foot overbridge pe divyangjanon ki suvidha ke liye ramp banane ka kaam ab chal raha hai. Unhone bataya ki nayi line mein pehle engine ka trial kiya gaya, uske baad Lichchhavi Express sabse pehle gujri.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

3368675 ★★★ 397mr.train_wala~
3619297 ★★★ 401HBR^~
3090937 ★★★ 71KeepTravelling^~
2308508 ★★★ 37Yantravinyas
6191858  11SreeNdl^~
2537064 ★★★ 65~
1959644 ★★★ 267Arpit~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy