First time I've ever heard of Corporates preferring 8 AM arrival over 6 AM Arrival.
I'm in Corporate Legal of a Multi National Bank, I know a lot of Corporate Heads myself- which corporate according to you doesn't prefer a 6 AM arrival ? Are you sure they're really traveling in this train spending 12 hours instead of simply taking a flight ? I have Gujarat under me, never met a Corporate doing this- but nevermind you're a local here so you must aware of others.
Since according to you multitude of Corporates...
more... are traveling in this, which Corporate in their right mind hasn't demanded a halt at Surat for this train ? If all the change in slots and timings is accomplished according to their wishes then halt at Surat should also be provided.
Back to the topic in hand, the current Coach Composition of Duronto is 15 Coaches- there's scope for Sleeper Coaches just like LTT Ernakulam Duronto. It already has multitude of AC 3 Tier, AC 3 Economy, AC 2 Tier coaches and AC First. Even after Adding 6 Sleeper Coaches there will be scope for adding an AC Coach if needed.
But I honestly say, I still have my doubts on this extension. It was wanted by many but was it needed is an altogether different matter entirely- but yeah still better than getting extended to Jodhpur, Udaipur, Hisar, Bikaner and whatnot. ЁЯШВ