By introducing this trains, rlys have gave a clear message that once UDZ-ADI G.C. is completed, this train will run upto ADI via HMT & a new AII-ADI route, the Mainline will be operational.
History says, AII-ADI via MJ-PNU was referred to Chord Line & AII-ADI via COR-UDZ-HMT was referred as Mainline during British MG ERA.
DEE 16.20; UDZ 04.55/05.15; ADI 10.40| ADI 17.35; UDZ 23.00/10; DEE 12.15.| In Future. 1029 kms in 18 hrs 30 mins @ 56 kph.