Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Thu Sep 12 13:43:54 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

JRAE/Jaugram (3 PFs)
जौग्राम
জৌগ্রাম

Track: Triple Electric-Line

Updated: Jul 10 2023 (17:32) by PrakharYadav^~
Jaugram Railway Station (JRAE) is located in Jaugram, West Bengal, and is a small station serving the local community. With 3 platforms, it offers basic amenities like waiting rooms and water facilities. The station serves as a convenient hub for exploring nearby attractions and witnessing the charming rural landscape.

Tourism

Kalighat Temple is a renowned Hindu temple dedicated to Goddess Kali.
Shantikunj Ashram is a spiritual retreat center known for its peaceful atmosphere.
The Jain Temple is a peaceful place of worship for the Jain community.
The Mosque is a place of worship for the Muslim community.
The Gurudwara is a place of worship for the Sikh community.

Food

Annapurna Restaurant serves delicious vegetarian thalis and snacks.
Shreeji Sweets is known for its variety of fresh sweets and savories.
Bhojanalaya provides a wholesome vegetarian dining experience.
The Dhaba offers simple but tasty vegetarian meals.
Vegetarian Delight is a popular spot for vegetarian snacks and beverages.

Station Address

Jaugram, Jaugram Main Road, Astai, Dist - Purba Bardhaman
State: West Bengal

Elevation: 85 m above sea level
Type: Regular   Category: SG-3
Zone: ER/Eastern   Division: Howrah


No Recent News for JRAE/Jaugram
Nearby Stations in the News
Number of Platforms: 3
Number of Halting Trains: 0
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: 5.0/5 (4 votes)
cleanliness - excellent (1)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - excellent (2)
sightseeing - n/a (0)
safety - excellent (1)

Station Forum

Page#    Showing 6 to 10 of 76 blog entries  <<prev  next>>
Rail Fanning
93048 views
14

★★
Jun 22 2020 (20:09)   DKAE/Dankuni Junction (5 PFs)
SAPTARSHI^~
SAPTARSHI^~   26762 blog posts
Entry# 4655314            Tags   Past Edits
◾EDFC Plan over existing Howrah division, Eastern Railway◾
.
▪️The tracks of DFC passes through Hooghly and Barddhaman District over Howrah division.
▪️The proposed track of DN DFC takes off at Ch. 15.441 from DN HBC line of Howrah – Delhi
...
more...
Rajdhani route near Dankuni. The UP DFC takes off from proposed UP HBC2 Line of IR at chainage 16.241 near Dankuni. UP DFC runs parallel to and on "south side" of UP Howrah – Barddhaman Chord Line upto Gobra and at Km.18.048 (between Gobra & Janai Rd.), the UP DFC crosses the existing IR track to Down side. From here, the double line DFC alignment is running parallel to and on "north side" of existing IR tracks.
▪️A "Junction" station "New Dankuni" has been proposed at Ch. 23.684 km near Begumpur station, between Janai Rd. and Baruipara. For providing connectivity to SAIL & other sidings near Dankuni
▪️Existing Seoraphuli-Tarakeswar line passes over the existing HBC line by a flyover near Kamarkundu. DFC line, which runs parallel to DN HBC, is required to cross the embankment of Seoraphuli-Tarakeswar line. It has been decided to accomodate the DFC suitably, by lowering the RCC Box to provide the required vertical clearance.
▪️Another "crossing" station "New Jaugram" has been proposed in between Jaugram and Nabagram at Ch. 66.000 km.
▪️The DFC tracks traverses almost parallel to the HBC line upto Palla Road station at Ch. 77.572 km.
▪️ From Palla Road, the Up & Dn DFC tracks crosses the Howrah-Barddhaman Chord line with a flyover at Ch. 78.041 km and then runs parallel on the "South side" of the Howrah-Barddhaman chord line.
▪️This flyover has been proposed to avoid following constraints:- (i) Saktigarh, Junction of Main Line and Chord line (ii) Barddhaman Diesel Shed. (iii) Barddhaman RRI cabin. (iv) Barddhaman – Katwa BG line.
▪️A major constraint is Barddhaman Junction Station and adjoining structures. The modifications are as under:
(i) Dismantling of Good Shed of Bardhaman station and shifting the same to the down side. (ii) Dismantling Station building, GRP office, AEN office, Running room, IOW office & store, New booking office, MFC building, etc. and reconstruction of the same.
(iii) Converting the Home Platform No.1 of Barddhaman station to Island Platform. Dismantling Delhi end of Platform No.1 for 180m length & extending the same towards Howrah end to accommodate DFC alignment.
(iv) Extension /modification to existing FOB’s to provide connectivity to all platforms from newly constructed circulating area. Remodelling of circulating area.
▪️A "Junction" station "New Khana" has been proposed at Ch. 104.151 km near between Talit & Khana to provide connectivity to Sahebganj Loop.
.
*This is for information of Rail enthusiasts & may be modified by authority. Please confirm through official site.*

Translate to English
Translate to Hindi

More Posts
Rail Fanning
272563 views
19

★★★
Aug 19 2020 (16:47)   MDSE/Madhusudanpur (4 PFs) | SRE/WAG-12B/60036
SAPTARSHI^~
SAPTARSHI^~   26762 blog posts
Entry# 4690927            Tags   Past Edits
▪️First commercial duty of WAG12 over ER ▪️
WAG12-B powering a Container Rake originated from Adani Logistics Ltd. (ALIK) to Khidderpore Dock (C)
Date: 19.08.20
Translate to English
Translate to Hindi

More Posts
General Travel
22180 views
2

Feb 10 2021 (20:09)   03176XX/Silchar - Sealdah Kanchanjunga Special | JRAE/Jaugram (3 PFs)
VPEEYYT~
VPEEYYT~   1834 blog posts
Entry# 4873029            Tags  
Kanchanjunga with WAP7
Translate to English
Translate to Hindi
Rail Fanning
27993 views
3

Jan 05 2021 (04:25)   JRAE/Jaugram (3 PFs)
SAPTARSHI^~
SAPTARSHI^~   26762 blog posts
Entry# 4834327            Tags  
Jaugram station/ER-HWH div
Translate to English
Translate to Hindi
Rail Fanning
279790 views
8

Jul 11 2019 (13:29)   36811/Howrah - Barddhaman Local via-Chord Line | KQU/Kamarkundu (5 PFs)
SAPTARSHI^~
SAPTARSHI^~   26762 blog posts
Entry# 4375235            Tags   Past Edits
First local of the day approaching Kamarkundu, while P.Way men taking a brief halt with Dynamic Tamping Express & awaiting clearance after a whole night work. #emuER
Translate to English
Translate to Hindi

More Posts
Page#    Showing 6 to 10 of 76 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy