Got the RTI Reply from NWR that all coaches were received by NWR but the operating department has utilized the coaches of 12479/12480 to convert other trains.
I dont know how and for which other train NWR has utilized the alloted coaches when specifically directed by RB for suryanagari.
Now LHB for suryanagari is surprise !