This is what "Rocket Express" Run should look like ЁЯШНЁЯШН, waited for 10 mins for 12431 Rajdhani crossing at Kawar but still covered 5 mins reaching Kumta otherwise always gets delayed 12-15 mins and 4 mins wait at Bhatkal for 20646 Vande Bharat crossing and from Madgaon it tried to cover every minute possible why am i saying this is that, normally after Karwar to Surathkal it gets delayed by average 10 mins at almost every halt, adding up to delay of 1 hour but the 30 minutes slack in b/w Surathkal to Mangluru makes it arrive only 25-30 mins late. Overall very happy with the consistency they are maintaining from 22nd March arriving MAJN with minimal delay. The return train 12134 however gets delayed by average 2 hours daily when it reaches Thane.