If they fix the fare of 3ACE at Garib rath fares then it's OK. Cannot be limted only to Garib raths as sleeper cannot be replaced with AC coaches in present mail/express trains. They need to replace certain number of SL with 3ACE in existing trains if they want to convert mail express into fully AC. Another one is ACCE to replace GS till now no action. These are all policy lapses.