Date:-5th June,2019
Loco:-JHS WAG7 27565
Train:-06025 CBE-MS-TPJ Summer SPL
Hii Guys here is the descriptive update regarding Tambaram-Chengalpattu tripling,for full update plzz refer the video above!!!
As works were in slow place till Guduvanchery, my...
more... coverage starts here. Before reaching Guduvanchery,some works started i.e poles were erected with C clamps and skeletal works were done not only here but also stations till Singaperumal kovil. Sleepers are kept aside in Katangalathur,Maraimalai Nagar. Surprisingly till Singaperumal Kovil almost all poles are erected with clamps also land levelling was over completely and almost all LCs are modified,in Katangalathur portala are laid. As we near SKL, some dunes were found after that track laid some distance before SKL,in SKL both loop and main lines are laid. But after SKL no works progrssed so i cut short my coverage till Singaperumal kovil
Thanks for watching!!, Subscribe to get more updates of project works!!!