It would be better if a new ERS to MYS train runs via SRR, MAQ, HAS be introduced instead of asking for extension of 16527/28. Timings can be say 1430 at ERS, 2130 at MAQ, 0600 at MYS. Return can be 2000 at MYS, 0530 at MAQ, 1200 at ERS. Entire Malabar region will get connected to MYS.