The Rake Requested in the Proposal for running this train was 1 AC 2 tier, 1 AC 3 Tier, 8 Sleeper, 6 General and 2 SLR.
MAS division has that rake of TVC NZM which has 2 tier AC - 01 Coach, 3 tier AC - 02 Coaches, Sleeper - 10 Coaches, General - 08 Coaches, SLR – 02 Coaches.(2-3 Gn and 1 Sleeper added by MAS). So They could easily transfer this rake To MDU division for Running RMM-MAJN.